DRILLING OF PARAMETRIC WELL CHUMPALOVSKAYA 1

Activities performed
  • Performance of a set of reconnaissance operations for selection and coordination with the customer of the best site for a drilling platform
  • Engineering surveys
  • Mobilization of equipment, performance of a set of preparations to the well construction
  • Parametric well drilling
  • Elaboration of ab array of geological information by the results of drilling, testing and survey of the parametric well
  • Well data processing, development of a final geological report
  • Region
    Kabardino-Balkarian Republic
  • Year
    2015-2021
  • Type
    National project, Regional geological prospecting for hydrocarbons
  • Contractor
    • RPC Nedra
      Region
      Central federal district
      Contacts
      • 150000, Yaroslavl, Svobody st., 8/38
      • +7 (4852) 72-81-01
      • +7 (4852) 32-84-71
      • nedra@rusgeology.ru
  • Clarification of geological structure in conjunction zone of Terek-Caspian depression and Nogai step
  • Assessment of hydrocarbon potential in the section of Mesozoic sedimentary cover
  • Production of technical and engineering conditions for deepening of the well to 6250 meters

PARAMETRIC DRILLING OF WELL NO.1 BAGENOVSKAYA

  • Region
    Ural Federal District, Tyumen Region
  • Type
    National project, Regional geological prospecting for hydrocarbons
  • Year
    2017-2019
  • Contractor
    RPC Nedra
Project in details
Previous project
Next project